This report highlights significant projects completed or currently underway at our complex from January 2017 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2017 year-to-date: 2
Townhouse Highest Selling Price year-to-date: $650,000
Garage Doors Replaced: 10
*********************************************************
~ end of 2017 highlights ~
NOVEMBER
- Balcony drains scoped and pipes replaced (16)
OCTOBER
- Sidewalk Concrete Restorations (8) #'s 35/54/55/56/57/58/69/85
- Sanitary and Storm Drains Cleaned
- Reserve Fund Study Completed (Study performed every three years)
SEPTEMBER
- Driveway Resurfaced (12) #'s 31/32/33/61/71/72/79/80/81/85/86/87
- Household Watermain Tap Replaced #43
- Roadway Paving - #65 to #78
AUGUST
- Bricks Disintegrated on Units were Replaced (8) #'s 54/55/57/81/82/85/88/90
- Catch Basins Repaired #'s 44/45/65
JULY
- Basement Waterproofed #82
- Household Watermain Tap Replaced #3
- All Street Lights were Converted to LED
JUNE
- Townhouse Sold #67
- Basement Waterproofed #54
- Electrical - Underground Street Light Wiring Replaced from #65 to #78
- Household Watermain Tap Replaced #'s 24/56
- Garage Door Replaced #27
- Landscaping Project - Clean-up and Mulch Garden across from #3
-
As reported at our AGM 12June17, the second and third phases of our window replacement
program are canceled this year due to budgetary restraints.
MAY
- Townhouse Sold #8
- Phase 1 Window Replacement Completed - 25 Front, 3 Back
- Garage Doors Replaced (9) #'s 8/15/16/18/20/22/24/33/37
- Eaves Troughs Cleaned
- Newsletter Delivered
APRIL
- Balcony Resurfaced (2) #'s 14/86
- Entrance Door Replaced (3) #'s 17/26/63
FEBRUARY
- Door from Garage into House Replaced #8
- Household Watermain Tap Replaced #8
JANUARY
- Basement Floor Drain Replaced #63
- City Watermain Tap Replaced #1
- Household Watermain Tap Replaced #'s 62/63