This report highlights significant projects completed or currently underway at our complex from January 2017 to date.  It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex.  Some months may not be listed as they have no such activities to report.

***************************************************

Townhouses Sold 2017 year-to-date: 2

Townhouse Highest Selling Price year-to-date: $650,000

Garage Doors Replaced:  10

*********************************************************

NOVEMBER

  • Balcony drains scoped and pipes replaced (16)

OCTOBER

  • Sidewalk Concrete Restorations (8) #'s 35/54/55/56/57/58/69/85
  • Sanitary and Storm Drains Cleaned
  • Reserve Fund Study Completed (Study performed every three years)

SEPTEMBER

  • Driveway Resurfaced (12) #'s 31/32/33/61/71/72/79/80/81/85/86/87
  • Household Watermain Tap Replaced #43
  • Roadway Paving - #65 to #78

AUGUST

  • Bricks Disintegrated on Units were Replaced (8) #'s 54/55/57/81/82/85/88/90
  • Catch Basins Repaired #'s 44/45/65

JULY

  • Basement Waterproofed #82
  • Household Watermain Tap Replaced #3
  • All Street Lights were Converted to LED

JUNE

  • Townhouse Sold #67
  • Basement Waterproofed #54
  • Electrical - Underground Street Light Wiring Replaced from #65 to #78
  • Household Watermain Tap Replaced #'s 24/56
  • Garage Door Replaced  #27
  • Landscaping Project - Clean-up and Mulch Garden across from #3
  • As reported at our AGM 12June17, the second and third phases of our window replacement
    program are canceled this year due to budgetary restraints.

MAY

  • Townhouse Sold #8
  • Phase 1 Window Replacement Completed - 25 Front, 3 Back
  • Garage Doors Replaced (9) #'s 8/15/16/18/20/22/24/33/37
  • Eaves Troughs Cleaned
  • Newsletter Delivered

APRIL

  • Balcony Resurfaced (2) #'s 14/86
  • Entrance Door Replaced (3) #'s 17/26/63

FEBRUARY

  • Door from Garage into House Replaced #8
  • Household Watermain Tap Replaced #8

JANUARY

  • Basement Floor Drain Replaced #63
  • City Watermain Tap Replaced #1
  • Household Watermain Tap Replaced #'s 62/63