Project Summary Reports
2021
This report highlights significant projects completed or currently underway at our complex from January 2021 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2021 year-to-date:
Townhouse Highest Selling Price year-to-date:
2020
This report highlights significant projects completed or currently underway at our complex from January 2020 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2020 year-to-date: 7
Townhouse Highest Selling Price for 2020: $665,000
Number of Board of Director Meetings Convened in 2020: 16
*********************************************************
The COVID-19 virus issue caused the delay of starting various projects that we had scheduled for the spring. Contractors, businesses and services were in lockdown. We enetered the second phase of opening during the last week of June and were able to proceed with select maintenance projects.
DECEMBER
- Chimney Caps Replaced on 4 Units
- Painting the Interior of Unit 91 Completed
NOVEMBER
- Conducted our first Virtual Annual General Meeting, 4Nov20
- Balcony Resurfacing Completed for #59 & #83, New Parapet Walls Installed
- Catch Basins Cleaned
- Chimney Caps Replaced on 10 Units
- Eavestroughs and Downspouts Cleaned Throughout the Complex
- Reserve Fund Study Completed
- Periodic Information Certificate (PIC) Delivered
OCTOBER
- Townhouses Sold: #42, #58
- Balcony Resurfacing Started: #83
- 2020 - 2021 Fall & Winter Newsletter Delivered
- Walkways Replaced - Qty 27
SEPTEMBER
- Arborist On Site to Cut and Trim Trees
- Entrance Doors Replaced: #54/66/74/84
- Household Watermain Taps/Valves Replaced: #73
- Roadway and Parking Lines Painted
- Roadway Signs Redesigned/Replaced
- Rusted Vent Pipes on Each Roof Painted
- Speed Bumps Painted
- Window Replacement - Phase 2: 39 Windows Front & Back
AUGUST
- Townhouse Sold: #66
- Basement Waterproofed - #87
- Reserve Fund Study Started
- Shingles Replaced on Full or Partial Sections of Roofs - Qty 34 partial
JULY
- Townhouse Sold: #35
- Catch Basins Repaired: #16, 17, 50, 51, 56
- Entrance Door Painted: #67
- Driveways Resurfaced: Qty 28
- Household Watermain Taps/Valves Replaced: #37
- Roadway Sections Paved /Speed Bumps Topped Up
JUNE
- Eavestroughs and Downspouts Cleaned Throughout the Complex
- Balcony Resurfaced - #59
- Window Replacement - Phase 1: #91 - 4 Sets of Windows
MAY
- Townhouses Sold: #50, #62
- 2020 Spring & Summer Newsletter Delivered
- Periodic Information Certificate (PIC) Delivered
- Household Watermain Taps/Valves Replaced: #89
MARCH
- Townhouse Sold: #61
- Basement Water Pipe Leak Repaired: In Bottom of Wall Between #57 & #58
2019
This report highlights significant projects completed or currently underway at our complex from January 2019 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2019 year-to-date: 13
Townhouse Highest Selling Price year-to-date: $589,900
Garage Doors Replaced: 3
*********************************************************
~ end of 2019 highlights ~
NOVEMBER
- Townhouses Sold: #45/56
- Balcony Resurface Repair in Progress #59
- Driveways Resurfaced: #20/21/48/49
- Eavestroughs Cleaned
- Household Leaking Watermain Tap Replaced: #71
- Sewers Cleaned & Inspected
OCTOBER
- Townhouse Sold: #36
- Entrance Doors Replaced: #10/25/60
- Newsletter Delivered
- Window Replacement Phase 3 completed
SEPTEMBER
- Townhouses Sold: #20/49
- Garage Doors Replaced: #29/44/54
AUGUST
- Townhouse Sold: #31
- Window Replacement Phase 2 completed
- Basement waterproofing completed in one unit
- Entrance doors re-painted to match garage door green colour (Qty 8)
JULY
- Roofs re-shingled - Qty 20
- Arborist work on trees completed
JUNE
- Townhouses Sold: #30/68
- Window Replacement Phase 1 completed
- AGM Meeting
MAY
- Townhouses Sold: #13/89
- Evestroughs Cleaned
- Catch Basin Repaired: #79
- Owner's Requisition Meeting
APRIL
- Townhouse Sold: #23
- Newsletter Delivered
- Owner's Requisition Meeting
MARCH
JANUARY
- Townhouse Sold: #29
- Basement Floor Drain Replaced: #32
- Household Leaking Watermain Tap Replaced: #27
2018
This report highlights significant projects completed or currently underway at our complex from January 2018 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2018 year-to-date: 1
Townhouse Highest Selling Price year-to-date: Mid $500,000
Garage Doors Replaced: 0
*********************************************************
~ end of 2018 highlights ~
NOVEMBER
OCTOBER
- Arborist Work Completed
- Parking Lines Painted
- Eavestroughs Cleaned
SEPTEMBER
- Painted the Back of all Townhomes in the Complex
- Household Leaking Watermain Tap Replaced: #20
AUGUST
- Catch Basins Repaired: #'s 8/28/38/77
- Entrance Doors Replaced: #'s 1/2/32/83
- Street Light Underground Wiring Replaced: from #40 to #44
- Phase 1 Window Replacement Completed: 31 Front, 2 Back
- Again this year, the second and third phases of our window replacement program have been cancelled due to budgetary restraints
JULY
- Balcony Stairs and Railings Replaced - 16 Units
JUNE
- Townhouse Sold: #72
- Catch Basins Repaired: #'s 11/85
MAY
- Catch Basins Repaired: #'s 20/21
- Newsletter Delivered
APRIL
- Balcony Resurfaced: #'s 59/89
- Evestroughs Cleaned
- Roof Repairs due to Storm Damage: #'s 28/30/31/32
2017
This report highlights significant projects completed or currently underway at our complex from January 2017 to date. It is not all inclusive of every workorder or activity performed, but is a summary of accomplishments that have an impact on the common areas and residents of our complex. Some months may not be listed as they have no such activities to report.
***************************************************
Townhouses Sold 2017 year-to-date: 2
Townhouse Highest Selling Price year-to-date: $650,000
Garage Doors Replaced: 10
*********************************************************
~ end of 2017 highlights ~
NOVEMBER
- Balcony drains scoped and pipes replaced (16)
OCTOBER
- Sidewalk Concrete Restorations (8) #'s 35/54/55/56/57/58/69/85
- Sanitary and Storm Drains Cleaned
- Reserve Fund Study Completed (Study performed every three years)
SEPTEMBER
- Driveway Resurfaced (12) #'s 31/32/33/61/71/72/79/80/81/85/86/87
- Household Watermain Tap Replaced #43
- Roadway Paving - #65 to #78
AUGUST
- Bricks Disintegrated on Units were Replaced (8) #'s 54/55/57/81/82/85/88/90
- Catch Basins Repaired #'s 44/45/65
JULY
- Basement Waterproofed #82
- Household Watermain Tap Replaced #3
- All Street Lights were Converted to LED
JUNE
- Townhouse Sold #67
- Basement Waterproofed #54
- Electrical - Underground Street Light Wiring Replaced from #65 to #78
- Household Watermain Tap Replaced #'s 24/56
- Garage Door Replaced #27
- Landscaping Project - Clean-up and Mulch Garden across from #3
-
As reported at our AGM 12June17, the second and third phases of our window replacement
program are canceled this year due to budgetary restraints.
MAY
- Townhouse Sold #8
- Phase 1 Window Replacement Completed - 25 Front, 3 Back
- Garage Doors Replaced (9) #'s 8/15/16/18/20/22/24/33/37
- Eaves Troughs Cleaned
- Newsletter Delivered
APRIL
- Balcony Resurfaced (2) #'s 14/86
- Entrance Door Replaced (3) #'s 17/26/63
FEBRUARY
- Door from Garage into House Replaced #8
- Household Watermain Tap Replaced #8
JANUARY
- Basement Floor Drain Replaced #63
- City Watermain Tap Replaced #1
- Household Watermain Tap Replaced #'s 62/63